Location
Rongpur, Dinajpur, Nilphamari, Joypurhat, Tangail, Chandpur, Rajshahi, Gopalganj, Netrokona
Duration
36 Months (Approx.)
Start Date
05.01.2021
Completion Date
30.12.2023
Detailed Narrative Description of Project: Design & Supervision of a specialized nos. 2000, 4000, 5000 MT. capacity all over Bangladesh, including Sorting Sheds all over Bangladesh for Strengthening (Quality) Seed Potato Production/ Procurement, Preservation, and Distribution among Farmers. Construction of Cold Storages & Multiple Sheds, including Ancillary Buildings Design, making BOQ, technical specification, including Supervision, and monitoring under the Bangladesh Agriculture Development Corporation (BADC). Project Estimated cost BDT. 11,38.00 crore
Name of senior professional staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:
Dr. Md. Shah Jahan : Team Leader
Engr. Md. Foysal Meah : Deputy Team Leader cum Senior
Foundation & Soil Engineer
Engr. Md. Ruhul Alam : Senior Structural Engineer (Super
Structure)
Engr. Mohammad Noor-Ul-Huda Emon : Inspection Engineer
Engr. A.M. Zubair-Ul-Mulk : Senior Civil / Structural cum
Plumbing Engineer
Engr. Md. Jahangir Alam : Senior Material Engineer
Engr. Md. Sumsir Jong Elahi Haider : Chief Engineer
(Construction & Supervision)
Engr. Benazir Chowdhury : Senior Structural Engineer
(Super Structure)
Engr. Md. Ariful islam : Senior Construction Engineer
Engr. Md. Mukhlasur Rahman : Site Engineer
Arch. Md. Hafijur Rahman Chowdhury : Architect
Engr. Monoranjan Kumar Roy : Electrical Engineer
Engr. A. Fattah-All-Monjur : Instrument Engineer
Engr. Mohammed Nazmul Haider : Mechanical Engineer
A. K. M. Hasan Sayed : Environmental Consultant
Ferdous A. Koreshi Raihan : Agriculturist
Description of actual services provided by our Staff:
Pre-design Phase
• Site analysis
• Land Survey (Topographic surveys)
• Sub-soil investigation
• Preparation of a conceptual architectural master Plan
showing the proposed Structure
• Approval of the conceptual master plan
Design Phase
• Preparation of all Sorts of Architectural Designs &
Drawings as per the TOR
• Preparation of structural (Both Foundation &
Super-Structure), following the BNBC 2020 code guideline
• Preparation of MEP Design & Drawings following the BNBC
2020 code guideline
• Preparation of Fire Detection & Protection Design &
Drawing as per fire & safety defense regulatory rules
• Preparation of Interior Design & Drawings as per TOR
• Land Scape & Site Development
• Preparation of BOQ & Cost Estimation
• Preparation of Cost estimation following the PWD current
rate schedule/ Market Prices
• Preparation of standard technical specification
• Preparation of standard tender document
Supervision Phase
• To assist the client with contract administration &
management.
• Site Supervision and quality control
• Progress & monitoring reporting
• Technical oversight of work
• To maintain the standard Health, Safety & Environmental
issues of the project
• Project closeout and handover