Location
Mirsarai, Chattogram
Duration
221 Months (Approx.)
Start Date
May, 2023
Completion Date
June, 2024
Narrative Description of Project: Selection of Transaction Advisory Services Firm (International) for Preparation of Feasibility Study Report for Establishing Common Effluent Treatment Plant (CETP-3A) and Desalination Plant (DESAL-2A) at (BSMSN). Preparation of all architectural designs and drawings, including complete building plans, sections, elevations, and 3D architectural views. Conducting land survey and soil testing (subsoil investigation) as part of the site development and engineering design process. Preparation of detailed engineering designs, including structural design; plumbing and sanitary system design; Water Treatment Plant (WTP) and Sewage Treatment Plant (STP); internal and external electrification; HVAC systems; lift and mechanical systems; fire detection and fire protection system design as per Fire Service & Civil Defense regulatory requirements; and preparation of the Bill of Quantities (BOQ) and cost estimation based on the PWD current rate schedule and prevailing market prices. Preparation of technical specifications and standard tender documents for all required works (International Tender awarded as Principal/Lead Consultant).
Name of Senior Professional Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:
Engr. Anuj K. Saha : Team Leader
Engr. James Vickers : Desalination Plant & Process Design
Expert
Engr. Abhijit Chattopadhyay : CETP & Process Design
Expert
Dr. Ferdoush Saleheen : Procurement Transaction Service
Expert
Dr. Engr. Rajendra Paode : Environmental Specialist
Prof. Dr. Mohammad Bellal Hossain : Social Specialist
Arch. Sazzadur Rasheed : Architect
Arch. Syed Muhammad Abu Sayeed: Architect
Arch. Abu Md. Fazlul Karim : Architect
Arch. Sazzadur Rasheed : Sr. Architect
Engr. M.S. Mahmoodur Rahman Peng : Civil Engineer
Engr. Md. Ruhul Alam : Civil/Structural Engineer
Engr. Benazir Chowdhury : Civil/Plumbing Engineer
Prof. Dr. Hafiz Abdur Rahman : Electrical Engineer
Engr. Md. Nizam Uddin Ahmed : Mechanical Engineer
Engr. Belal Ahmad : Mechanical Engineer
Dr. Engr. Md. Shah Jahan : Civil Engineer
Engr. Md. Hamidul Haque Hazari : Civil Engineer
Engr. A. F.M Muzammel Haque : Chemical Engineer
Engr. Md. Mukhlasur Rahman : Estimator
Dr. Md. Shakhawat Hossain Chowdhury: Financial
Specialist
Engr. Most. Sabina Yeasmin : AutoCAD Operator
Engr. Rameza Akter : AutoCAD Operator
Mr. AKM Mojibul Hossain : Surveyor
Detailed Description of Actual Services Provided by our Staff:
Part-I: Common Effluent Treatment Plant
(CETP-3A)
• The assignment involves a detailed feasibility study,
transaction advisory services, Plant Design-Drawings,
detailed BOQ estimates, and Tender documents in line with
FIDIC (International Federation of Consulting Engineers)
documents to be duly customized to fit the Public
Procurement Rules (PPR) of the Government of
Bangladesh.
Part-II: Desalination Plant (DESAL-2A)
The Feasibility and the Transaction Services will be
comprised of the following tasks, but not limited to:
• Task 1: Feasibility study with competitiveness analysis,
techno-financial viability, technology/market assessment,
benchmarking of global best practices, selection of
available technologies; existing demand & forecast,
marketing strategy, stakeholder consultation;
• Task 2: Preparation of a conceptual design of CETP,
DESAL plant, and collection/distribution networks
considering pre-treatment, CETP, and DESAL discharge
standards, considering appropriate technology, and keeping
provision of future expansion;
• Task 3: Preparation of detailed Plant Design, Tech.
Specifications, Estimate, BOQ for construction of CETP (50
MLD & DESAL- (50MLD) considering efficient collection and
distribution system, transfer, treatment, recovery,
disposal facilities integrating cost recovery as well as
raw water collection, brine water disposal, and fresh
water supply related mechanism, network, etc. /DoE
regulations/client and safeguard requirements;
• Task 4: Comprehensive financial analysis for CETP-3A and
DESAL-2A construction, operation, and maintenance, along
with validation of capital expenditure, tariff policy,
cost recovery/ revenue generation schemes based on best
practices or any other factors deemed relevant by the
consultant;
• Task 5: Carry out necessary market sounding and
interaction with Stakeholders, based on a field visit,
baseline survey, topographic/geotechnical investigation,
examination of on-site/off-site facilities,
characteristics of waste mix from various industries in
BSMSN, and other necessary information.
• Task 6: Technical due diligence, schedules, and
documentation;
• Task 7: Environmental and Social Feasibility, Impact
Assessment, Management Plan & Quality Assurance,
contractual obligations, and any other reports or services
for DOE requirements:
• Task 8: Structural organizational framework,
institutional relationship, designated responsibilities
with a corresponding management system, Quality Assurance,
Standard Operating Procedure, and capacity building
programs for the CETP and DESAL plant management
facilities;
• Task 9: Review the legal basis of the proposed project
structure / DBO modality. Advice must be in compliance
with all elements of Bangladeshi laws, all implementing
regulations, and international best practices.
• Task 10: Examining CETP-3A & DESAL-2A experiences in
Bangladesh and similar Industrial Zones across the world,
examining existing practices- DBO guidelines, Statutory
guidelines, etc., as well as a case study;
• Task 11: The transaction adviser will work out the
appropriate DBO model for the contract and advise BEZA on
project implementation, including providing an
Implementation Manual.
• Task 12: Prepare outline design details and respective
BOQ, estimate, along with DBO documents in line with FIDIC
contract, duly customized to fit into PPR. Information
Memorandum, Request for Pre-qualification (RFQ) / RFP,
among others, etc.;
• Task 13: Evaluation of the RFQ/ RFP and finalization of
the DBO contract documents. Assist BEZA in getting the
Tender documents for DBO vetted by the Central Procurement
Technical Unit CPTU, Govt. of Bangladesh;
• Task 14: Assist BEZA in short-listing Tenderers through
evaluation of Pre-Qualification Applications /
Documents;
• Task 15: Assist BEZA/ Technical Evaluation Committee
(TEC) / Technical Sub-Committee in the evaluation of
Tender documents towards awarding of the contract;
• Task 16: Consultants have prepared a comprehensive
report in view of the final studies and design details in
order to provide a response to the respective Donor's
following queries that should ensure compliance with all
requirements of the Donor as stated below.
i. Implementation of this project shall not have any
bearing on the proposed water-sharing agreements on any
transboundary river with Bangladesh, including the Feni
River.
ii. A mass balance statement for each process unit should
supplement the concept to understand the feasibility of
the process to meet the characteristics of treated
effluent. Detailed design calculations for I&D design work
and the basis for chemical calculations should be
provided.
iii. Process & Instrument, Diagram, and Hydraulic flow
diagram may be furnished.
iv. Unit-wise treatment efficiency and influent, effluent
characteristics of each treatment process should be
tabulated.
v. The capacity of the proposed CETP shall be based on the
existing /planned water-polluting industries (based on
consent provided by the Regulator so far as the processing
capacity of each industrial unit is concerned),
incorporating the future expansion prospects also situated
in Bangabandhu Sheikh Mujib Shilpa Nagar.
vi. The list of existing/planned water polluting
industries with discharge, along with the statutory
license/ consent to operate, duly signed by the pollution
or similar environmental regulatory authority. This
regulatory instrument may guide the capacity of CETP.
vii. Information regarding the proposed collection and
conveyance system for influent and effluent from each
industry has not been provided. Preferably C&C system
should be a closed conduit pressurized network to prevent
any unlawful discharges.
viii. The information on Primary Effluent Treatment Plant
(PETP) implementation in each individual industrial unit,
effluent discharge details, flow meter installation
planning, etc., has not been provided by the responsible
authority for CETP.
ix. Influent wastewater characteristics at the inlet of
CETP from each industrial unit have not been provided in
the DPP. In addition, there are no defined design
characteristics (pH, BOD, COD, TSS, TDS, FDS, heavy
metals, etc.) provided for the proposed CETP.
x. Any possibility of impact, in case of shock load from
effluent received from the homogenization tank/
Equalization tank in the CETP, may also be indicated in
DPP.
xi. A detailed water balance and mass balance of the CETP
and Desalination plant should be arrived at and included
in the DAPP so that it will be easy to understand the
quantity and quality of reusable water and sludge.
xii. Reuse of treated effluent and Sludge or third
disposal methods have not been proposed in the DPP.
xiii. Sludge generation - The basis of sludge (biological
and chemical) estimation, along with supporting
calculations, may be furnished in DPP.
xiv. The details regarding management of sludge handling,
disposal to TSDF, and consequent transportation costs
shall be included in the final DPP.
xv. Materials balance diagram of the CETP showing
consumption of chemicals, and generation of sludge of each
participating industry on a per-day basis needs to be
submitted.
xvi. The details of. A Common Chrome Recovery System
(CCRS) may be provided.
xvii. In a Desalination plant, how is scaling on the
membranes taken care of? What are the inlet and outlet TDS
in the Reverse Osmosis unit? What is the TDS of the
concentrated brine rejects from RO? The disposal mechanism
for brine is not clear.
xviii. Project Completion time frame and activity-wise
Gantt Chart are not to be provided.
xix. The CETP proposal may be vetted by the regulatory
environmental pollution control authority.
xx. The civil items coming in contact with effluent need
to be coated with corrosion-resistant epoxy paint. This
aspect must be considered in design and cost estimates.
xxi. Detailed information regarding infrastructure
facilities like power supply, power backup, alternate
sources of energy, and transport facilities may be
furnished.
xxii. The geotechnical investigation report needs to be
provided to understand the bearing capacity considered for
the cost estimate.
xxiii. Details of the Environment Management Cell (EMC) to
be provided, such as details of the laboratory, trained
staff details, occupational environmental monitoring for
the related industrial cluster.
xxiv. The scope of the Project Management Committee (PMC)
for the proposed project implementation and the
qualification criteria of key personnel (Like Team
Leader/Deputy Team Leader) should also be revisited since
the whole project involves high technical and management
experience.
xxv. The collection and Conveyance system should be a
pressurized system with each industry having its own
functional PERP conforming to norms.
xxvi. The proposed CETP is based on a ZLD system, or if
not, dilution for meeting TDS standards should be
stated.
xxvii. Index-map xxvii. Index-map should be
incorporated.
xxviii. Sludge drying beds have been provided, whereas a
drying press should have been provided.
xxix. The Operation & Maintenance cost details were not
provided, and the funding for the same for sustainable
operation should also be pre-decided.
xxx. For the sustainability of Operations, an appropriate
business model should be put in place wherein a Special
Purpose Vehicle for O&M of the plant should be put in
place. SPV should fix the effluent quantity to each
industrial unit and levy O&M charges based on effluent
characteristics as well as volumetric measurements of
effluents. SPV
Detailed HVAC System Design
Detailed plumbing & Sanitation design as per BNBC
guideline
Detailed design of sewerage, stormwater & solid waste
management system
Details of the security Access system design / BMS
design
Flood Inundation Study in Detail
Detailed traffic impact design
Detailed structural design with green concept
IEE/EIA/EMP report preparation as per DOEB Guideline.
Solid waste management system
Detailed cost Estimation as per the PWD revised rate
schedule 2022
Rainwater Harvesting System Design
STP design
Total water supply network design
Surface water treatment plant design
Desalination plant design
GIS model design
Total Electronic System Design
Playground design for schools/colleges, and others.
Financial Analysis
Economic Analysis